Unknown

Dataset Information

0

Bi-Objective Flexible Job-Shop Scheduling Problem Considering Energy Consumption under Stochastic Processing Times.


ABSTRACT: This paper presents a novel method on the optimization of bi-objective Flexible Job-shop Scheduling Problem (FJSP) under stochastic processing times. The robust counterpart model and the Non-dominated Sorting Genetic Algorithm II (NSGA-II) are used to solve the bi-objective FJSP with consideration of the completion time and the total energy consumption under stochastic processing times. The case study on GM Corporation verifies that the NSGA-II used in this paper is effective and has advantages to solve the proposed model comparing with HPSO and PSO+SA. The idea and method of the paper can be generalized widely in the manufacturing industry, because it can reduce the energy consumption of the energy-intensive manufacturing enterprise with less investment when the new approach is applied in existing systems.

SUBMITTER: Yang X 

PROVIDER: S-EPMC5131930 | biostudies-literature |

REPOSITORIES: biostudies-literature

Similar Datasets

| S-EPMC10751839 | biostudies-literature
| S-EPMC8176541 | biostudies-literature
| S-EPMC10115896 | biostudies-literature
| S-EPMC7259647 | biostudies-literature
| S-EPMC7710087 | biostudies-literature
| S-EPMC4503688 | biostudies-literature
| S-EPMC4281465 | biostudies-other
| S-EPMC6764687 | biostudies-other
| S-EPMC10834064 | biostudies-literature
| S-EPMC8929393 | biostudies-literature