Operation mode selection of NIMBY facility Public Private Partnership projects.
Ontology highlight
ABSTRACT: Construction of not in my back yard (NIMBY) facility Public Private Partnership (PPP) projects are feasible measures to realize sustainable urbanization. In order to ensure the smooth development of the NIMBY facility PPP projects, the problem of choosing the most suitable operation mode among many PPP modes is still scarce and unscientific. In order to select the operation mode of the PPP projects that best fits the characteristics of the project, this paper constructs the operation mode selection of the NIMBY facility PPP project. Firstly, the index system of operation mode selection of the NIMBY facility PPP project is determined. G1 subjective weighting method and information entropy objective weighting method are introduced to solve the optimal weight of each index. Grey correlation theory is used to improve TOPSIS method, and the calculation form of relative proximity degree is optimized to determine the most suitable operation mode for the project. In this paper, combined weighting and TOPSIS method are applied to the research of NIMBY facility PPP project, and the operation mode selection of NIMBY facility PPP project is established, which makes up the blank of this part. Finally, a PPP project in Qingdao, Shandong Province, China, is taken as an example to verify the applicability of the model. The effectiveness of this model was tested by comparing the results of TOPSIS method, Grey target model, Extended matter-element mode and GRA-TOPSIS. It is hoped to provide useful reference for the operation mode selection of NIMBY facility PPP project.
SUBMITTER: Zhao H
PROVIDER: S-EPMC8270188 | biostudies-literature |
REPOSITORIES: biostudies-literature
ACCESS DATA