Ontology highlight
ABSTRACT:
SUBMITTER: Liu G
PROVIDER: S-EPMC9910742 | biostudies-literature | 2023
REPOSITORIES: biostudies-literature
Liu Guanyi G Li Xuemei X Alam Khalid Mehmood KM
PloS one 20230209 2
The importance of the time-cost-quality trade-off problem in construction projects has been widely recognized. Its goal is to minimize time and cost and maximize quality. In this paper, the bonus-penalty mechanism is introduced to improve the traditional time-cost model, and considering the nonlinear relationship between quality and time, a nonlinear time-cost quality model is established. Meanwhile, in order to better solve the time-cost-quality trade-off problem, a multi-objective immune wolf ...[more]