An innovative time-cost-quality tradeoff modeling of building construction project based on resource allocation.


ABSTRACT: The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.

SUBMITTER: Hu W 

PROVIDER: S-EPMC3929567 | biostudies-other | 2014

REPOSITORIES: biostudies-other

Similar Datasets

| S-EPMC5988424 | biostudies-literature
| S-EPMC3024398 | biostudies-literature
| S-EPMC1810080 | biostudies-other
| S-EPMC116588 | biostudies-literature
| S-EPMC6263160 | biostudies-literature
| S-EPMC8342476 | biostudies-literature
| S-EPMC5135070 | biostudies-literature
| S-EPMC6868164 | biostudies-literature
| S-EPMC10698983 | biostudies-literature
| S-EPMC6347206 | biostudies-literature